MyCES

Home

Products

About

EMARS

Energy, Monitoring, Analysis and Reporting System

A smart system initiative for comprehensive energy management across industrial, commercial, education and healthcare buildings — crucial for improving energy efficiency and reducing operating costs through system modernisation.

Data. Action. Savings.

EMARS login page — intelligent energy management for a sustainable future

Introducing EMARS

Comprehensive energy management, built in

A smart system initiative for comprehensive energy management for Industry & Commercial Building — crucial for improving energy efficiency and reducing operating costs through system modernization.

Introducing EMARS

Real-Time Monitoring

Monitor energy usage directly and continuously.

Cloud-Based Monitoring Dashboard

Centralized cloud-based energy monitoring and visualization.

Operational Efficiency

Reduce manual dependency and improve centralized energy visibility.

Supporting Industry 4.0 Towards Industry 5.0

Supports transformation through IoT and smart energy management.

Track Record

Key projects & implementations (2019–2026)

2019

  • Kuantan Medical Centre
  • Kayaku Safety Systems Malaysia

2020

  • UM Specialist Centre

2022

  • UiTM Penang
  • UiTM Jengka
  • UiTM Dungun
  • UiTM Alor Gajah
  • UiTM Segamat
  • UiTM Kuala Pilah
  • Hospital Rehabilitasi Cheras (HRC)

2023

  • Hospital Rembau

2024

  • Idemitsu
  • Institut Jantung Negara (IJN)
  • Kayaku
  • Purecircle Sdn Bhd
  • Hospital Rehabilitasi Cheras (HRC)

2025

  • Institut Jantung Negara (IJN)
  • Semasa Parking Sdn. Bhd.
  • Kuantan Port
  • Koito
  • Kiswel

2026

  • KJM
  • KYB-UMW

2019

  • Kuantan Medical Centre
  • Kayaku Safety Systems Malaysia

2020

  • UM Specialist Centre

2022

  • UiTM Penang
  • UiTM Jengka
  • UiTM Dungun
  • UiTM Alor Gajah
  • UiTM Segamat
  • UiTM Kuala Pilah
  • Hospital Rehabilitasi Cheras (HRC)

2023

  • Hospital Rembau

2024

  • Idemitsu
  • Institut Jantung Negara (IJN)
  • Kayaku
  • Purecircle Sdn Bhd
  • Hospital Rehabilitasi Cheras (HRC)

2025

  • Institut Jantung Negara (IJN)
  • Semasa Parking Sdn. Bhd.
  • Kuantan Port
  • Koito
  • Kiswel

2026

  • KJM
  • KYB-UMW

EMARS awarded projects (as of 2026)

23 awarded projects across industrial, education and healthcare sectors.

EMARS awarded projects by sector

10

Industrial Sector

Idemitsu, KYB-UMW Malaysia Sdn. Bhd., Kuantan Port and others.

6

Education Sector

UiTM Jengka, UiTM Shah Alam, UiTM Dungun and others.

7

Healthcare Sector

Institut Jantung Negara (IJN), Hospital Rembau, Cheras Rehabilitation Hospital (HRC) and others.

Business Benefits

Everything you need to see where energy goes

EMARS business benefits and technical dashboard

End-User Training

User training for application navigation and usage.

Graphical Reporting System

Analyze data into graphics and tables, accessible by authorized staff and exportable by users.

Automated Alerts

Instant notifications for anomalies, equipment failures, and unusual spikes.

Multi-Site Integration

Integrate multiple sites into one system for HQ monitoring.

Features & Capabilities

One server, every branch

Each building has its own EMARS account. To overcome the issue of accessing branch servers one by one, MyCES EMARS can be integrated under a single server.

EMARS features and capabilities

Headquarters Monitoring

HQ can monitor all branch buildings through a single platform.

Data Integration

Install Digital Power Meter (DPM) or transfer data from existing DPMs to the MyCES server.

Easy Comparison

Energy usage from each location can be directly compared in a single page.

Energy & Power Monitoring System

Record and monitor energy consumption (kWh), power (W) and power factor (PF).

System Data Flow

Functional data transfer between digital power meters, energy loggers, and cloud servers.

Data Visualization & Access Control

Data extracted in graphic and tabular form, viewable by authorized staff.

Cloud Data Accessibility

Data can be extracted from the cloud via a web interface and viewed anytime and anywhere.

System Architecture

Working principle of EMARS

Digital Power Meter → RS485 → Data Logger → Cloud → AWS Server

EMARS system architecture and working principle

Hardware

Processor

Intel Processor

CPU

4 Cores / 4 Threads

Base Frequency

0.8 GHz

Max Clock Speed

3.4 GHz

TDP

6 Watts

Core Features

Integration

Multiple DPMs in one channel

Data Retention

Up to 7 years

Storage Options

Local & Cloud storage

Meter Compatibility

DPM and DLMS meters

Communication Protocols

RS485, TCP/IP, BACnet

Parameter Capacity

Supports thousands of parameters

User Access

Unlimited users

Proven Results with EMARS

Impact of energy saving measures

Reduction in energy consumption, with higher production — tracked side by side against TNB usage and total operating hours.

Total usage trend vs operation hours, Apr 2019 to Dec 2021
Energy consumption comparison, Site A Pahang

Site A, Pahang — monitored vs. actual energy and cost, Jul 2020 & Aug 2022

Energy consumption comparison, Site B Kuala Lumpur

Site B, Kuala Lumpur — monitored vs. actual energy and cost, Apr–Jun 2022

Conclusion

Energy, Monitoring, Analysis and Reporting System

EMARS provides a centralised platform to monitor, analyse and manage energy performance — enabling smarter and more efficient energy management.

EMARS conclusion summary

Monitor

Track energy consumption.

Analyse

Understand energy performance.

Report

Generate energy reports.

Identify

Detect inefficiencies & saving opportunities.

Optimize

Improve efficiency & reduce costs.

Supporting the journey towards Malaysia Net-Zero 2050

Energy Management & Compliance

EECA Compliance / ISO 50001

Green Building & Certification

GBI / GreenRE / LEED

ESG & Sustainability Reporting

ESG Disclosures / Bursa Malaysia

National Sustainability Goals

UN SDGs / Malaysia Net-Zero 2050

PRODUCTS

EMARSFMSAGROFARM (Coming Soon)

COMPANY

CONTACT

20-1, Jalan Damai Mewah 1,
Taman Damai Mewah, 43000 Semenyih, Selangor

Phone: (+60) 3-8725 5811

Email: info@mycesgroup.com

STAY UPDATED

Get the latest MyCES news and product updates.

© 2026 Myces Manufacturing. All Rights Reserved.